안전을 넘어 그 이상의 가치, 고려 E&C

Company introduction

Company history

  • 2016
  • · Soil drilling equipment patent application
  • 아부다비 정유시설
  • 2015
    • · Transfer of addresses. 2F, 210 Kwangnaru Road, Seongdong-gu, Seoul
    • · WIN KOREA Partnership (The win + Korea E&C)
    • · Removal of pillar and bearing wall, connecting the undergrounds through underground excavation construction (Chungju Bokdaedong Catholic Church)
    • · World's first basement removal and addition of a floor on a five-story building (Ulsan Namgu Shinjungdong)
    • · No-vibration rock breaking equipment development
    • · Registration of the overseas construction industry (Arab Emirates, Abudabi oil refining facility strengthening, settling restoration)
  • 2014
    • · Basement construction and floor addition while the hospital was in operation (Busan Good Culture Hospital B1--> B2 floor, 4th floor --> 14th floor)
    • · story height extension, pillar cutting, and remodeling (Seoul Gangnam YMCA, Jeonbook Okjeongho pump station)
    • · Basement connection of pipe utility conduit of Kyonghee Medical Center
  • 2013
    • · Certification of the New Excellent Technology No.682 ‘Column Reinforcement Technology’
    • · Green Technology certified GT 13-56, ‘Pillar fireproof strengthening technology’
    • · Φ609 concrete filled tube load test, Φ609-40m indentation (complex stake: PHC+steel pipe)
    • Development of trenchless duplex digging system that does not need a tempo rary wall t
    • · Pisa's Apartment TV show (KBS 9pm, MBC 8pm, SBS 8pm, and YTN broadcast)
  • 피사의 아파트, 강남YMCA
  • 2012
    • · Green Technology certified GT 12-93, 'Pillar Strengthening Technology'
    • · Awarded by the Minister of Land, Trnasport and Maritime Affairs
  • 2011
    • · Certification of the New Excellent Technology No.629 ‘Foundation Reinforce ment Technology’
    • · Patent registration (no. 1026731) on basement extension construction technology
    • · Industrial-Educational Coopration Award ‘Seismic reinforcmenet plan using wire rope’
    • · Registation ‘Byun Hang Ryong’ as a master at Northeast Forestry University in Heilongjiang, China
  • 2010
  • · Chosen as excellent projct by the Korea Industrial Educational Cooperation for development of seismic reinforcmeent technlology of the ferroconcrete
  • 2009
    • · World's first whole bridge height extension (1m)
    • · New technology award ‘Research on environment friendly strengthening technology using wire rope’ - Diagnositc and Mintenance Engineering Society
    • · New tehcnology award for PR&BT environment friendly strengthening technology development - Dianostic and Maintenance Engineering Society
  • 2008
  • · The world first ‘Work to raise temple structure to 1.3m above the ground with boulder-foundation in China
  • 중국 왕교진 현무묘
  • 2007
    • · Patent registration (no.621669) on press filing method
    • · Patent registration (no.807810) on strengthening trhough increasing section
    • · Patent registeration (no. 763634) on construction and seismic reinforcmentt technology and wire rope eye-bolt tension reinforcement
  • 2006
    • · Patent registration (no. 589975) on wire rope eye-bolt tension reinforcement technology
    • · Received presidential citation - awardee Byun Hangyong
    • · INNOBIZE industry recognition
    • · The world first ‘Restoration work to raise a leaning building with 19 stories’
  • 2004
  • · Patent registration (no. 453108) indentation method using reaction, PCT registration, registered in the U.S. and China
  • 대불공단, 전남 금능교
  • 2003
  • · New technololgy no. 1472 registered by the Ministry of Science and Technology (Patentt no. 414448_Wire Rope Eye-Bolt Tension Reinforcement Technology)
  • 1999
  • · Establishment of Korea E&C, a professional construction reinforcement company (coonstruction maintenance)