전체

Good Moonhwa Hospital

The hospital was still in operation while the first basement floor was extended to the 2nd basement floor, and the ground 5th floor was increased to 14th floor. The basement was extended with the original reinforced stake and the pillar was reinforced to safely increase the floors to the 9th floor.

  • LocationBeomil-dong, Dong-gu, Busan
  • Time period2013. 05 ~ 2015. 06

 

Before construction 

 

 

 

Non-adhesive pillar reinforcement method was applied 

 

 


 Safely reinforced the building after placing the floor of the 1st story and topping down the basement 

 

 


 

After construction​ 

 

 

 ​