전체

Gangnam YMCA

The height of the building was increased without taking the building apart or moving the residents out. The structure increase method was applied without removing the 20mx30m, height 5m space. The pillar was cut and the space was remodeled to a party room of 8m in height. Thee construction time and cost were saved, and the complaints from the users were also minimized while all increasing the value of the space.

  • LocationNonhyeon-dong, Gangnam-gu, Seoul
  • Time period2014. 01 ~ 02

 

Before construction 

 

 


 

After construction

 

   



 

 

 

After remodeling

 

 ​