This construction took place in an extremely narrow space of 0.5m. The original revetment was extended 3m more to the basement to make it 6m in a condition where the pilaster mass does not even protrude out.
Before construction
Original wall
Seonsa Gas Station original basement extension plan
During construction
After construction