전체

Hannam House

The high retaining wall on three of the sides of the ground increases the risk of the house settling. The reinforcement method of filling the gap with cement can cause accidents by pressuring the walls. The stake induction method does not cause any vibration or noise and can minimize the residents' complaints. We installed the anchor and steel stake to solve the problem. This method is highly effective on areas where an equipment cannot fit through.

  • LocationHannam-dong, Yongsan, Seoul
  • Time period2014. 07 ~ 2015. 02

 

New construction on the tilted ground

 







 

Stake installation plan

 

 


 
 

Instrumental individual indentation

 

 


 

Instrumental simultaneous indentation 

 

 


 

Indented stake - above the original 

 

 


 

Indented stake - below the original​