전체

Nokbeon Catholic Church

This construction involved expanding the multi-purpose space by removing the bearing wall of the underground hallway. A saddle was installed in the top central part of the wall and a non-adhesive tension reinforcement was used to pull the wall from each side. This was opposite than when we worked on the Hyunsu aqueduct.

  • LocationNokbeon-dong, Seoul
  • Time period2010. 03

 

Nokbeon church view 

 

 


 
 

during construction, support with jacked up pile

 

  


 

stranded tension and reinforcement condition  

 

 

 

Mltimaterial pillar due to wire rope bolt/nut bending