Daebul complex

The ground on the lower portion of the support system before concrete placement was sinking, causing slap and PC beam droop. The drooping slab was raised with jack-up method and the PC beam that had cracked was removed and exchanged with a new one. The reinforcement left no residues.

  • LocationMokpo, Jeollanam-do
  • Time period2006. 05


 

During construction

 

 

 

 

 

After construction

 ​