The bridge was reinforced with stake and the settled part from scouring was restored. The bridge slab was raised at the same time while exchanging the damaged bridge bearing, and the damaged pier was reinforced with wire rope tension.
Before construction
Basic lower part's soil condition
after construction | cylinder elongation