Gimpo Fire Station

The police building that was reinforced with stake out of the 2 buildings constructed on the weak ground did not settle, but the two story fire station right next to it was slowly tilting. The building that was constructed with basic construction on weak ground faces the load of the building and the foundation directly. The foundation soil of the building was weak down to 10m below ground and the hard ground was underneath that. The building with 210m2 of the floor surface area that was tilted was reinforced with 30 of the 216 steel stakes being indented, and the building was upgraded to grade A standards.

  • LocationGangamaro, Gimpo, Gyeonggi-do
  • Time period2014. 12 ~ 2015. 01

 

Before construction

 

 


 

After construction , the weak ground was reinforced but the settlement was promoted due to increased weight  

 ​