전체

Anyang river railroad bridge

The 318 steel stake was removed and non-drilling indentation was performed to strengthen the foundations of the pier during the railroad operation.

  • LocationGyeonggi Anyang
  • Time period2013. 11 ~ 2014. 06

 

Anyang river railroad bridge view 

 

 


 

During construction

 ​