전체

Uiseong Hospital

The basement floor of the funeral ward of Uiseong hospital (floor area 1,000m (40x25m) was not settled because it was built on hard ground, but when the water damage occurred from flooding resulted the building to be half tilted. The weight of the building was around 3,000 ton and the floor area was 1,000m2, so when more than 3m of the floor sinks under water, the building begins to rise up due to buoyancy. We suspected that the building was raised to 1m and sunk again, and proceeded with indenting 60 of the 100 ton of stakes all at the same time to restore the situation.

  • LocationGyeongbuk Uiseong
  • Time period2015. 06 ~ 08

 

Before construction

 

 


 

After construction