Sinpyeonggyo in Jeollanam-do

The slab was raised without bridge bearing just like how we did with the Suro Bridge. We used highly elastic rubber stability device. The stake was indented underneath the slab and the indented stake was used again with the reaction force to simultaneously pressurize the 3 slabs before installing the bridge bearing.

  • LocationHaenam, Jeollanam-do
  • Time period2009. 08


 
 

During construction