Ulsan Hospital considered rebuilding portion of its building by tearing down the building that was behind, but it could have been risky such that the construction confirmation might get denied in addition to requiring more parking space. The internal pillar of the building on the road side was removed to expand the space and the total of 6 story building including the basement was raised with one more floor. The newly added floor was constructed so that cars can pass and the buildings in the front and back were connected to increase the value of the overall building. With remodeling method, we expanded parking spaces and relieved the stress of construction law.
Before construction
pillar removal with jack up method
pillar removal completion
After construction