The hospital was still in operation while two of the 10 story buildings were connected from the bottom portion of the machine room located on the under ground 2nd floor. The buildings were connected through stake indentation method under the plumbing pipes and vertically drilling 90m on the 3mx3m pipe utility conduit.
basement box 90m underground tunnel connecting work
Completion after the connecting work
Pipe utility conduit construction completion
After construction