After reinforcing the foundation and other structures using Jack Pile without occupants’ leaving the building.
(New Excellent Technology certification No. 629 - Foundation Strengthening)
The reinforcing technology of structure-foundation using equipment is difficult to work in the space which is close to columns or small space. Also, it need the long-term moving out of occupants because vibration, dust and noise occur during construction
The Jack Pile technology is the scientific technology of which the strata of reinforced pile end can be measured as a quantitative N value. It can reinforce the foundation by pilot bearing piles without vibration, noise and dusts as approaching close to a column or wall in a small space while a structure is being used. By settling columns outside of a building or reinforcing the minimum column in side of a building, it can extend building vertically while running a business, applying pillar/earthquake resistance reinforcement technology designated as ‘New Excellent Technology’.
When the building gets underground extension, a thin pile like micro pile often ends up being excavated unless it is reinforced by additional bracing process. However, Jack Pile can excavate underground 5m without reinforcing bracing and form a safely floating structure with smaller load.
(New Excellent Technology certification 629 - Foundation Reinforcement)
This method uses foundation reinforcement and other structural reinforcement to raise the height from the rooftop floor while the residents are living in the building (new construction technology no. 629 - foundation reinforcement)