① Non-drilling
② No vibration / low noise (electric motor noise)
③ Construction possible in narrow space (minimum floor height 1 m, width 0.5 m)
④ Check all files (100%) bearing capacity
⑤ Verification of foundation proof strength at construction
⑥ Drilling at the basement level 1 or 2 without bracing
Construction after extension of section on side(from the left)
Extension of cross section (reclamation of steel pipe slabs and lower anchor) -> Pressurized frame construction -> Individual compression ->Current pressure-when necessay -> finish
-March 2017 Pohang Gas Corporation, Restoration work