Each pipe racks had 400 PHC concrete stake with a load strength of 60ton, but the increase in equipment led to reinforcement. The reinforcement could not be done on the original pipe and the stakes so we added two of the 20 ton stakes.
Pipe rack reinforcement location status
Basic reinforcement of the pillar within the dotted line
Basic reinforcement after extending the surface through shearing bar reinforcement